Concrete Calculator

Calculate how much concrete you need for slabs, footings, or columns. Get cubic yards, bag counts, and a rough cost range — bags vs. ready-mix.

You'll need
1.34
cubic yards
(1.03 m³)
60 lb bags
81
80 lb bags
61
Est. cost (bags)
$366
Est. cost (ready-mix)
$229

Cost is rough estimate based on 2026 US averages. Get a local quote before ordering.

How it works

The concrete formula

Volume is just length × width × depth (for slabs and footings) or π × r² × height (for columns). The trick is converting to the unit your supplier uses: cubic yards in the US, cubic meters in metric markets.

cubic ft = L × W × D (or π × r² × H for columns)
cubic yards = cubic ft ÷ 27
cubic meters = cubic ft × 0.0283168

Bag yields are standard: an 80 lb bag of pre-mix yields about 0.6 cubic feet, a 60 lb bag about 0.45 cubic feet.

Always add a waste factor (10% default). Real pours have spillage, over-excavation, and last-minute fixes. Better to have 5% extra than to run out mid-pour.

FAQ

Frequently asked questions

Yes — even careful pours have spillage, over-excavation, and form irregularities. 10% is a safe default for slabs; 15-20% for complex shapes or rough ground.

80 lb bags are more efficient cost-per-pound and faster to mix in bulk. 60 lb bags are easier to lift one-handed and good for small repairs. For anything over ~½ cubic yard, consider ready-mix delivery instead.

Usually above 1 cubic yard. Ready-mix runs ~$140-180 per cubic yard delivered (varies by region and minimum-load fees). A cubic yard is 60 bags of 80 lb mix at ~$6 each = $360+ just for material, so delivery wins quickly.

4 inches for sidewalks, patios, and light foot traffic. 5-6 inches for driveways and garages. 8 inches for heavy vehicle traffic or footings. Always check local code.

No — this only calculates concrete volume. Rebar and welded wire mesh add cost but don't change concrete volume. Plan separately.

More construction tools coming.

Lumber estimator, roof pitch, stair calculator, drywall, and paint coverage are next.